Client : Sabic

Contract Type : Construction

Work Location : Safco Utility 3, Jubail

Brief Description of Work :

Replacement of existing acid line with newly fabricated PTFE lined spools.

Line is designed to handle 98% concentrated sulfuric acid.

Dimensional check, Spool clearance, Spools pressure test, Spool surface preparation & painting

is performed as per requirement and spools are released for construction.


Warning: A non-numeric value encountered in /home/syed6056/public_html/wp-content/themes/almeersaudi/includes/wp_booster/td_block.php on line 353