Client: Saudi Aramco
Contract Type: Maintenance – Instrumentation
Work Location: Abqaiq Oil Plants
Brief Description of Work:
To upgrade a total of 63 Fisher DVC6000 and Masoneilan/Neles Smart positioners. The upgrade process includes but not limited to:
- Field Verification & measurement for each control valve to identify the suitable bracket for installation
- Providing the required material (Bracket & New Positioner) to be installed in the field
- Retrieving old positioner’s data & calibration parameters.
- Removal of the old positioners and installing of new positioners and performing calibration.
- Commissioning of the new positioner.
- Providing one simulation unit for training purposes and field training sessions for Saudi Aramco representatives.
- Providing 3 sets of 475-Field Communicator along with standard accessories