Client: Saudi Aramco     

Contract Type: Maintenance – Instrumentation 

Work Location: Abqaiq Oil Plants

Brief Description of Work:

 To upgrade a total of 63 Fisher DVC6000 and Masoneilan/Neles Smart positioners. The upgrade process includes but not limited to:

  • Field Verification & measurement for each control valve to identify the suitable bracket for installation
  •  Providing the required material (Bracket & New Positioner) to be installed in the field
  • Retrieving old positioner’s data & calibration parameters.
  • Removal of the old positioners and installing of new positioners and performing calibration.
  • Commissioning of the new positioner.
  • Providing one simulation unit for training purposes and field training sessions for Saudi Aramco representatives.
  • Providing 3 sets of 475-Field Communicator along with standard accessories

Warning: A non-numeric value encountered in /home/syed6056/public_html/wp-content/themes/almeersaudi/includes/wp_booster/td_block.php on line 353