AlMeer Saudi’s scope included design, engineering, procurement, supply of materials, fabrication, inspection, installation, FAT, pre-recommissioning, commissioning, SAT, integration with existing system, construction, installation, pre-commissioning of multi-step capacitor banks at the 34.5 kV level at SEC Main Intake Area Substation 75A and at Tankage Area Substation 75B to improve factor to 0.96.